PALL-X 2-KOLORIT APPLICATION INSTRUCTIONS
PREPARATION:
- Sand and prepare the wood floor in accordance to NWFA (National Wood Flooring Association) sanding guidelines. More information on these guidelines can be found at www.nwfa.org
- It is recommended to water pop wood prior to application of PALL-X 2-KOLORIT. As soon as the floor is visibly dry, begin application of PALL-X 2-KOLORIT.
- PALL-X 2-KOLORIT is a two component (Comp. A & Comp. B) stain & sealer.
Prior to mixing, always bring PALL-X 2-KOLORIT to room temperature.
Thoroughly stir Comp. A before adding Comp. B. Mix both parts at a 5:1 ratio (5 parts A to 1 part B), stirring for 60 seconds. When blending different colors or batching multiple units it is recommended to mix in a separate container.
NOTE: One bottle of hardener (Comp. B) will activate one can (Comp. A) of PALL-X 2-KOLORIT. - PALL-X 2-KOLORIT may be applied using a buffer, stainless steel trowel, or rags.
Pallmann Demo Theater - PALL-X 2-KOLORIT NWFA Expo 2023
NOTES:
- Prior to application, always perform a color sample test on the wood floor in a small area to ensure desired color.
- PALL-X 2-KOLORIT colors can be blended to achieve a custom color.
- A second coat of PALL-X 2-KOLORIT may be applied to darken or enhance color. If second coat is applied, 12 hours must elapse before coating with fi nish.
- For best results the recommended application method is with a Stainless Steel Trowel (item #12506) and removing with a white or red pad on a rotary buffer.
- While buffing, work backwards out of the job area to ensure that all footprints are removed.
- Clean tools and applicators with PALLMANN® Clean Box wipes.
- PALL-X 2-KOLORIT (not hardened) can be used hours or days after initial opening. Opened containers should be securely recapped and stored in a cool location until reused. KEEP FROM FREEZING.
WARNINGS:
- DO NOT recap PALL-X 2-KOLORIT after hardener has been added as a vapor pressure explosion will occur.
- Risk of Ignition! PALL-X 2-KOLORIT contains natural oils that may pose a risk of ignition. Rags and other materials containing this product may heat and spontaneously ignite, if exposed to air. Soak any wiping rags and similar materials with water and keep/dispose in tightly sealed, airtight metal containers.
- Sanding dust of oxygen-drying systems are a fire risk! After conclusion of sanding, the sanding dust must be soaked with water and disposed of in tightly sealed, air tight, fire proof containers!
- FOR PROFESSIONAL USE ONLY
- Refer to safety information on product label as well as the product’s Safety Data Sheet (SDS).
- DO NOT THIN this product.
- Call the PALLMANN® division of Uzin Utz North America before using for technical advice if needed (1-866-505-4810).
BUFFER APPLICATION:
- See PREPARATION Instructions.
- With a gloved hand apply product into corners and edges with a small red or white polishing pad or carpet pad.
- Pour a small amount of PALL-X 2-KOLORIT into the center of a polishing pad or carpet pad. Starting 2 feet from wall, work PALL-X 2-KOLORIT into wood until all areas are covered. Add more product as needed to maintain coverage rates.
- Allow PALL-X 2-KOLORIT to penetrate wood floor for a minimum of 5 minutes and no longer than 30 minutes prior to removing excess material.
- With a gloved hand and a clean small white polishing pad or clean, dry, lint-free cloth rags remove excess material from corners or confined areas where buffer cannot reach.
- Remove excess PALL-X 2-KOLORIT with a clean white polishing pad or carpet pad under the buffer. When pad is saturated (leaves swirls or slings product), flip pad over and use reverse side or change to a new pad. Multiple pads will be needed for the removal
of excess material. - Use a clean white pad or carpet pad until all excess material is removed.
- See FINISH Instructions
TROWEL APPLICATION:
NOTE: If floor has beveled edges or is hand scraped, DO NOT trowel apply. The buffer application or rag on/off are the preferred methods.
- See PREPARATION Instructions.
- Pour a 6 – 8 inch puddle of PALL-X 2-KOLORIT directly onto the floor. Using a flat, stainless steel trowel (item #12506), apply material across the floor. Add additional material to the puddle as needed.
- Allow PALL-X 2-KOLORIT to penetrate wood floor for a minimum of 5 minutes and no longer than 30 minutes prior to removing excess material.
- With a gloved hand and a clean small white polishing pad or clean, dry, lint-free cloth rags remove excess material from corners or confined areas where buffer can not reach.
- Remove excess PALL-X 2-KOLORIT with a clean white polishing pad or carpet pad under the buffer. When pad is saturated (leaves swirls or slings product), flip pad over and use reverse side or change to a new pad. Multiple pads will be needed for the removal of excess material.
- Use a clean white pad or carpet pad until all excess material is removed.
- See FINISH Instructions
Rag on/off Application:
Preferred method for stairs, landings, and harder to reach areas.
- See PREPARATION Instructions
- Using clean, dry, lint-free cloth rags, saturate with PALL-X 2-KOLORIT and apply to raw wood.
- Allow PALL-X 2-KOLORIT to penetrate wood floor for a minimum of 5 minutes and no longer than 30 minutes prior to removing excess material.
- Use clean, dry, lint-free cloth rags to remove excess.
- Keep coverage rate around 300 – 500 square feet per liter.
- See FINISH Instructions
Finish:
- Maintain a coverage rate of approximately 300 – 500 square feet per liter. Sanding sequence and wood species will affect coverage rates.
- Five hour dry/coating time with normal climate conditions of 65 – 75°F and 50% RH. 12 hour dry/coating time for white or pastel (containing white pigment). Cooler temperatures and higher moisture may delay dry/coating times. Warmer/dryer conditions may expedite drying time.
- PALL-X 2-KOLORIT is a stain and sealer in one application. Additional PALLMANN® waterborne sealers may be applied when dry, but are not required. Apply any PALLMANN® finish over PALL-X 2-KOLORIT within 3 days (72 hours) of initial application.
If more than 3 days (72 hours) has elapsed, PALLMANN® PALL-X BOND recoat adhesion product must be applied prior to a PALLMANN® waterborne finish. Contact your local PALLMANN® Territory Manager for further assistance.